NEWS CENTER

Learn the latest infoδ→±rmation

NEWS

Yimai Information

MORE >>

Company profile

Entering Yimai and Creating t '↕he Future

Shanghai Yimai Industrial Co.ltd

Innovation, hard work, excelle φ§nce, focus on improving professional servic'λ✘es

Provide customers with green solutions for the whole life cy•♦cle and create a better living ecological environ"× ment

Shanghai Yimai Industrial Co., Ltd. δ'is a high-tech enterprise inte♦ grating R&D, production,∏→ sales and service. The company's main prσ★oducts: manufacturing of special machinery a∞↓nd equipment for water♣  resources, intelligent water affairs i• ntegrated series produ₽"cts, complete sets of αεwater supply integrated series  ★π↔products, sewage series products, kitc↑×₹hen (organic) waste '↑treatment series products, direct drinking wat∏§£®er, integrated water plants, motors®&γ and pumps, etc. The pr↔≤oduction base is located in Shangha÷"≤i Jinshan Industrial an↑Ω±∑d Economic Development Zone.

MORE

ENGINEERING CASE

Achieving win-win and development

Project Name: Shuiyunhe Courtyard in Xinghua Cβαity (Beishan Resettlement House)

Project Overview: The Shuiyun Heyuan p ​φ↔roject is located in Xi™£&nghua City, Jiangsu Provin₹↓ce, with a total construction area of 52351.δπ★&4m2, including a total above ground cons‍✘→truction area of 104693.3m2 and an underground co'↓✘nstruction area of 32374.2m2 (including a c∞"♣ivil defense enginee>₩±™ring area of 6674m2)

System design: The number of pressurized hε±β★ouseholds is 610, with 3-9F as pressurize≤☆d zone 1 and 10-15F as pressurized zone 2. T★₽♥₹wo sets of tank type stacke↑£≠≠d water supply equipment, ∑€↕πYMWXG64.8-41-3 and YM₽≠✘<WXG27-56-3, are used for pressurized water®•  supply

Design key points: wet dry sepa£✔↔ration, equipment layout, visiting passages≥>, decoration, high-end hardware αλδ•

The pump room construction standard is b✔₩ased on the "Yimai Standar♣π≤€d Smart Pump Room Construction Standard".

Project Name: Shuiyunhe Courtyard in Xinghua C→​"×ity (Beishan ResettlemΩ®¥"ent House)

Project Overview: The Shuε∏iyun Heyuan project is located in Xinghua City↕™φ÷, Jiangsu Province, with a total constru‌φction area of 52351.4m2, incl↔∑£uding a total above ground co​Ω₽ nstruction area of 104693.3m2 and an underαεground construction area of 32€♥374.2m2 (including a c'®ivil defense engineering area oλ↓ε>f 6674m2)

System design: The number of pressurized househoδ←lds is 610, with 3-9F as pressurized zone •∞♦1 and 10-15F as pressurized zone 2. Two s★‌£₹ets of tank type stacked♦¥≈ water supply equipment, YMWX® →G64.8-41-3 and YMWXG27-56-3‌↓∑, are used for pressurized water supply

Design key points: wet ↑≠dry separation, equi↑♠‌¶pment layout, visiting passages, decor •$ation, high-end hardware

The pump room construction standard is basδ€↓₽ed on the "Yimai Standard Smart Pump∏"≥♦ Room Construction Standard".

Project Name: Jiantou a✘±>λnd Runjia Garden in Lingbi County

Project Overview: The He Run Jia Yuan p£§σ>roject is a key resetα&✔tlement housing proj×↑ect in Lingbi County, coverin <↕↔g an area of approximately 38.3 acres wit♣×↓±h a building area of 7553β★3 square meters. It mainl→™✔y includes 6 high-rise residential bui≈←£ldings, commercial and und∑•erground parking lots, and supporti"÷∑♦ng facilities such as sur©>rounding green landscapes, and can accommodate ₩α•→a total of 486 households of surrounding resid♦®ents

System design: 1-11F is the first press$δ↕‍urized zone, and 12-18F is the second pres€÷≥surized zone; 19-23F is the t♠♠£βhird zone of pressurization. Three sets oβ•‍∏f tank type stacked water  ★$♥supply equipment, YMWG37-42-3, YMW ÷G20-64-3, and YMWG15-83-3, are used<γβ✘ for pressurized water supply

Design key points: wet dry separaδ∑₩tion, equipment layout, visiting passageδ ​s, and decoration

The pump room construction stan₹≈dard is based on the "Yimai St®✔andard Smart Pump Room Constructi±×Ωon Standard".

Project Name: Jiantou and Run‍'☆→jia Garden in Lingbi County

Project Overview: The He Run Jia Yuan projec‍∏t is a key resettlement housing proπ ject in Lingbi County, covering an are'βa of approximately 38.3 acres♠'&≈ with a building area of 75533 square meters. IΩ₽€t mainly includes 6 ★ high-rise residential ¥↔$↑buildings, commercial and​®★ underground parking lots, and supporting fac$↑ilities such as surrounding green landscapes,£β and can accommodate a total of 486 ₩ε​households of surrounding residents

System design: 1-11F§₩↕​ is the first pressurized zone, aδγ₩nd 12-18F is the second preε'¶ssurized zone; 19-23F is t♣©↔σhe third zone of pressurizati∞®on. Three sets of tank type stacked wat£↔↕er supply equipment, ©‌YMWG37-42-3, YMWG20-64-3, and YMWG15-83§∑-3, are used for pressurized water supply

Design key points: wet dry separat€∑ion, equipment layout, visiγ∏↓ting passages, and decoration

The pump room construction staπ¶☆ ndard is based on the "Yimai Standard Smφ∑←&art Pump Room Construction "£Standard".

Partners

Achieve win-win and development